Performing Arts Center

Austin PAC
Performing Arts Center
continue reading
Hutto Ninth Grade Center
The building is laid out with educational appropriateness as the driving factor and includes collaborative learning environments that focus on flexibility, small learning communities, and student engagement. Phase one features: three separate “cohorts” centered around a collaborative learning space multipurpose/lecture...
continue reading
Pieper High School Entrance - Pfluger Architects' Design in San Antonio
Pieper High School
From the very beginning, this site was intended to accommodate a high school and middle school for the Kinder Ranch development. The breadth of the site was carefully considered in the design to minimize cut and fill and to retain...
continue reading
Southside High School
Southside High School
continue reading
Sandbrock Ranch Elementary
continue reading
Hidden Lake Elementary Hallway
Smith Elementary School Library
Bar W Elementary Windows
Jackson Middle School
Jackson Middle School
continue reading
Hunters Creek Courtyard
Hunters Creek Elementary
Nestled in the trees, the design was based on the same notion as the original—being at one with nature and the surrounding area. A building footprint optimized for the tight site saved most trees. By bringing nature within arms reach,...
continue reading